TM 10-5410-224-14
5. Cup (10)
1. Pin (2)
6. Fitting assembly (8)
2. seal
7. Panel
3. Roof assembly
4. Rivet (30)
(5) Reconnect electrical cabling in accordance
b. Installation. To install the foldout roof
panels on the expandable shelter, perform the
following procedure:
4-15. Electrical
System Circuit Breaker Panel.
(1) Carefully place foldout roof panel on
expandable shelter so that its hinge half aligns
with the hinge half on the center structure roof
The expandable shelter contains voltages
panel.
that are dangerous if contacted. Before
(2) Insert hinge pin (1, fig. 4-6) into hinge.
removing or installing electrical cables or
components, make certain electrical power
Have at least four men support hinged roof
is completely disconnected.
panel in the following step.
a. Removal.
(3) Swing up foldout roof panel and foldout
(1) Tag disconnected leads to ensure proper
swingout walls and foldout end wall. Secure
connection.
foldout roof panel to both swingout walls using
(2) Set all circuit breakers on circuit breaker
four latches (4, fig. 4-2) and to foldout end wall
panel to off position.
(4) Reconnect tie down cables.