TM 10-5411-203-13
2-5. REMOVAL PROCEDURES (CONT)
a. Removal of Complexing Kit Passageway - Type I (ISO Shelter to ISO Shelter) (Cont)
WARNING
When installing or removing frame assembly, take care to avoid getting
fingers caught in hinged joints. Failure to do so may result in serious
injury.
NOTE
The next procedure requires two persons in the ISO shelter.
(3)
Remove frame assemblies (1) from both ISO shelter openings using the following steps:
(a) Unlatch and remove locking pins (2) on sides (3) of frame assembly (1) and insert locking pins in retainer tubes.
NOTE
The following steps must be performed at the same time in both ISO
shelters.
(b) Pull sides (3) toward center until top assembly header frame starts coming down.
2-39