TM 10-5411-203-13
2-4. INSTALLING AND PREPARATION FOR USE (CONT)
b. Installing Complexing Kit Passageway - Type II, Class A and Class B (ISO Shelter to TEMPER) (Cont)
(27)
Adjust the doors using the following steps:
(a) By moving pedestal assemblies (1) and pivot assemblies (2) on each door, adjust gap (3) between doors and gap
(4) between doors and sides of passageway frame. Gaps should be approximately 1/8 in. After an even gap is
obtained ,tighten mounting screws on pedestal assemblies (1) and pivot assemblies (2).
(b) Adjust gap between top of door and top of passageway frame by turning height adjusting 3crew (5) clockwise to
raise door.
(c) Test doors by swinging one, then the other thru full range of motion. If any interference is encountered additional
adjustment may be necessary.
2-34