TM 10-5411-203-13
2-4. INSTALLATION AND PREPARATION FOR USE (CONT)
b. Installing Complexing Kit Passagewav - Type II, Class A and Class B (ISO Shelter to TEMPER) (Cont)
(18)
Tie off becket lacing with half-hitch knot using the following steps:
(a) Upon reaching the last loop (1) and inserting through last grommet (2), insert next-to-last loop (3) through last
loop (1).
(b) Pull next-to-last loop (3) up towards top of grommet flap (4).
(c) Push under second-from-last loop (5) and pull through until tight to form half-hitch knot.
(19)
Repeat steps (16), (17), and (18) to secure other top side of passageway/TEMPER connection using loops from
TEMPER and grommets from passageway.
(20)
Repeat steps (16), (17), and (18) to secure sides of passageway/ TEMPER connection.
(21)
Cover becket laces with flap and secure with attached hook and loop strips.
(22)
Slip loops at ends of becket flap over corresponding wooden toggles located in sides of connector.
2-29