TM 10-5411-203-13
2-4. INSTALLATION AND PREPARATION FOR USE (CONT)
b. Installing Complexing Kit Passagewav - Type II. Class A and Class B (ISO Shelter to TEMPER) (Cont)
(16)
Ready connector assembly (1) for becket lacing using the following steps:
(a) Select connector's becket assembly level which most closely matches the same height as that by the TEMPER
entrance.
(b) Locate first top center loop on connector assembly (1) and first top center grommet on grommet flap (2) of
TEMPER.
(c) Overlap TEMPER grommet flap (2) onto connector assembly (1).
(17)
Becket lace connector assembly (1) to grommet flap (2) using the following steps:
(a) Starting from top center of connector assembly (1), insert loop (3) into grommet (4) and loop (5) into grommet (6)
of grommet flap (2).
(b) Insert loop (5) up through loop (3).
(c) Pull loop (5) tight.
(d) Insert loop (7) through grommet (8) and through loop (5).
(e) Pull loop (7) tight.
(f)
Continue becketing procedure all the way across crown of grommet flap (2) until top cover of grommet flap (2) is
reached.
2-28
