TM 10-5411-203-13
2-4. INSTALLATION AND PREPARATION FOR USE (CONT)
b. Installing Complexing Kit Passagewav - Type II, Class A and Class B (ISO Shelter to TEMPER) (Cont)
(12)
Place header bar (1) through support straps (2) along roof of connector assembly (3).
(13)
Connect upright bars (4) to header bar (1) using the following steps:
(a)
Insert both upright bars (4) into header bar (1).
(b)
Insert locking pins (5) into holes to secure upright bars (4) to header bar (1).
WARNING
The Complexing Kit Passageway components include two ramps and a
stairway. The ramps weigh approximately 145 pounds (65.77 kg) and
195 pounds (88.45 kg) re- spectively, and the stairs (complete assembly)
weigh approximately 70 pounds (31.75 kg). Four persons are required to
handle each of these components. Attempting to lift or carry any one of
them by yourself could result in serious injury or damage to the
equipment.
CAUTION
Do not permit ramp or stairway to drop. Support ramp or stairway
throughout lowering procedure to prevent damage to connector
assembly.
(14)
For Type II, Class A, place ramp inside Complexing Kit Passageway.
2-25