TM 10-5411-203-13
2-5. REMOVAL PROCEDURES (CONT)
a. Removal of Complexing Kit Passageway - Type I (ISO Shelter to ISO Shelter) (Cont)
NOTE
The next procedure requires two persons in- side the ISO shelter (1) and
two persons out- side the ISO shelter (1)
(1.1)
Remove weather barriers (2) from ISO shelter (1) using the following steps:
(a) Unlatch all roof panel latches.
(b) Using two roof panel struts (3), push up hinged roof panel (4) until roof support struts (3) are in the upright
position.
(c) Lower struts (3) to floor until hinged roof panel (4) is supported by struts (3).
WARNING
When removing the weather barriers between hinged roof panel and ISO
shelter wall, take care to avoid getting fingers caught. Failure to do so
may result in serious injury.
(d) Pull weather barriers (2) out of open space between hinged roof panel (4) and ISO shelter (1).
(e) Using the two hinged roof support struts (3), lower roof panel (4) onto ISO shelter (1).
(f)
Store hinged roof support struts (3) on stowage brackets.
(g) Latch all panel latches to secure hinged roof panel (4) to ISO shelter (1).
(h) Repeat steps (a) thru (g) above for other weather barrier.
2-37