TM 10-5411-203-13
2-5. REMOVAL PROCEDURES (CONT)
a. Removal of Complexing Kit Passageway - Type I (ISO Shelter to ISO Shelter) (Cont)
(c) Raise one corner of the bottom assembly header frame (1) until the corner of frame is free of ISO shelter wall.
(d) Gradually lower opposite upper corner of frame assembly (2) until top assembly header frame is free of ISO
shelter wall.
(e) Move lower frame assembly off lip of ISO shelter opening.
(f)
Gradually lower top assembly header frame (2) until top assembly header frame rests on bottom assembly
header frame.
(4) Pick up and move Complexing Kit Passageway from between ISO shelters.
(5) For packaging procedures for the Complexing Kit Passageway, refer to paragraph 2-6a.
2-40