TM 9-2330-390-14&P5-6.HYDRAULIC CONTROL VALVE REPAIR (Con’t).NOTEl Preformed packings should be lightly coated with hydraulic fluid before assembly.l All new kit items and new tie-rod set items should be used during assembly.1.Assemble three new tie-rods (15) inlet section (16), four new preformed packings (17 and 18) two lift cylinderwork sections (19), eight new preformed packings (17 and 18) positioning cylinders work section (9) four newpreformed packings (17 and 18), and outlet section (20).2.Install six new lockwashers (14) and new nuts (13) on tie-rods (14). Torque nuts to 144-156 lb.-in. (16-18 N•m).5-18
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business