TM9-2330-390-14&P4-119. OIL COOLER LINES REPLACEMENT.This Task Covers:a.Removalb.InstallationInitial Setup:Equipment Conditions:Material/Parts:· Oil cooler and rocker arm covers removed (see· Rags (Item 25, Appendix F)paragraph 4-117).· Fuel tank and stay removed (see paragraph 4-125).Tools/Test Equipment:· General mechanic’s tool kit (Item 30, Appendix G)NOTE1.2.Use rags as required to clean any oil spills.Remove two clips (3) and oil pipe (4) from oil cooler (1) and joint (5) at side of cylinder head (6).Remove two clips (7) and oil pipe (8) from oil cooler (1) and joint (2) at top of cylinder head (6).4-344
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business