TM 9-2330-390-14&P
2-13.
ATTACHING FRONT AND REAR DOLLIES TO SHELTER (SHELTER ON TRAILER)
(SIDE LIFT OPERATION) (Cont).
c.
Remove each dolly half from maneuvering
position (see paragraph 2-21 c).
d.
At front and rear, remove two detent pins (2)
and telescopic brace (5) from top beam (1) and drawbar
(4). Set telescopic braces aside.
e.
At front and rear, remove safety pin (8) and
hitch pin (9) and unlock pivoting tray lockout brace (6)
from lower bracket (7).
f.
At front and rear, install lifting chain (10) to each end of top beam (1) with shackle (11) and pin (12)
through hole.
2-93