TM 9-2330-390-14&P2-13.ATTACHING FRONT AND REAR DOLLIES TO SHELTER (SHELTER ON TRAILER)(SIDE LIFT OPERATION).All personnel must use caution when standing near front and rear dollies and shelterduring attaching operations. Failure to follow this warning may cause serious injuryor death to personnel.Front axle steering locking pin must ALWAYS be installed for side lift operation.Failure to follow this warning may cause front dolly to overturn, resulting in seriousinjury or death to personnel.Use extreme caution when using ladder. Have an assistant hold ladder to ensure thatit is stable. Failure to follow this warning may cause serious Injury to personnel.This operation CANNOT be performed unless Direct Support Maintenance hasinstalled side lift kit on dolly set.NOTEComponent parts of side lift kit are stowed in storage box of front dolly.a.Place each dolly half in maneuvering position (see paragraph 2-21 b).While in maneuvering position, DO NOT operate positioning cylinders lever. Failure tofollow this warning may cause bottom beam to lower to the ground, causing seriousinjury to personnel.b.Move each dolly half into position at centerline of side of shelter (3). Place within 6 in. (15 cm) of shelter.2-92
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business