TM 9-2330-390-14&P2-13.ATTACHING FRONT AND REAR DOLLIES TO SHELTER (SHELTER ON TRAILER)(SIDE LIFT OPERATION) (Con’t).g.At front and rear, perform the following steps, maintaining top and bottom beam vertical tubes (17)vertical.(1)Pull down on two lift cylinder levers (15) to extend lift cylinders (13).(2)Pull down on positioning cylinders lever (16) to extend positioning cylinders (14).(3)Repeat steps g(1) and g(2) as required until top beam (1) is positioned ABOVE shelter (3) and topand bottom beam vertical tubes rest against shelter.h.At front and rear top beams (1), remove twodetent pins (18) and rotate top hooks (19) 180° awayfrom shelter engagement position. Install detent pins.i.Remove two detent pins for crossbraceassemblies (20) from storage box on front dolly.2-94
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business