TM 9-2330-390-14&P
2-13.
ATTACHING FRONT AND REAR DOLLIES TO SHELTER (SHELTER ON TRAILER)
(SIDE LIFT OPERATION) (Cont).
g.
At front and rear, perform the following steps, maintaining top and bottom beam vertical tubes (17)
vertical.
(1)
Pull down on two lift cylinder levers (15) to extend lift cylinders (13).
(2)
Pull down on positioning cylinders lever (16) to extend positioning cylinders (14).
(3)
Repeat steps g(1) and g(2) as required until top beam (1) is positioned ABOVE shelter (3) and top
and bottom beam vertical tubes rest against shelter.
h.
At front and rear top beams (1), remove two
detent pins (18) and rotate top hooks (19) 180° away
from shelter engagement position. Install detent pins.
i.
Remove two detent pins for crossbrace
assemblies (20) from storage box on front dolly.
2-94