TM 9-2330-390-14&P2-13.ATTACHING FRONT AND REAR DOLLIES TO SHELTER (SHELTER ON TRAILER)(SIDE LIFT OPERATION) (Con't).Use extreme caution when climbing and working on top of shelter during side liftoperations. Ensure that top of shelter is free of ice or debris which could cause slipsand falls. When working with twist locks from on top of shelter, maintain athree-point contact with shelter as much as possible. When on top of shelter, alwaysbe aware of where other personnel and tools are located to prevent accidentalbumps and trips. Failure to follow this warning may cause serious injury topersonnel.All personnel standing on ground must stand clear when crossbrace assemblies arebeing removed from top beam. If a crossbrace assembly Is dropped, serious injuryor death to personnel could result.j.At front and rear, remove detent pin (21) and crossbrace assembly (20) from stowage in top beam (1).Rest crossbrace assemblies on top of shelter (3).k. Remove detent pin (23) securing each crossbrace assembly (20) in retracted position. Mendcrossbrace assembly until two holes aline. Install detent pin (23) and detent pin (24) that was removed from storagebox.l.Extend crossbrace assemblies (20) over top of shelter (3). Crossbrace bracket (25) at each end ofcrossbrace assembly should be positioned flush against top beam (1). Operate hydraulic control valve as required toachieve proper alinement (see paragraph 2-21).2-95
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business