TM 9-2330-390-14&P2-13.ATTACHlNG FRONT AND REAR DOLLIES TO SHELTER (SHELTER ON TRAILER)(SIDE LIFT OPERATION) (Con’t).q.At front and rear, perform the following steps:(1)Push up on two lift cylinder levers (15) to lower crossbrace assemblies (20) onto top of shelter (3).Dolly set is now suspended by crossbrace assemblies.Use caution to ensure that lift cylinder grease fittings DO NOT contact suspension linksand become damaged.(2)Push up on positioning cylinders lever (16) to retract positioning cylinders (14). Stop when greasefitting (34) at base of each lift cylinder (13) is 1 In. (2.5 cm) above suspension link (35). This corresponds to an angle ofapproximately 30° between lift cylinder and suspension link.2-98
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business