TM9-2330-390-14&P2-15. DETACHING FRONT AND REAR DOLLIES FROM SHELTER (SHELTER ONTRAILER) (SIDE LIFT OPERATION).All personnel must use caution when standing near dolly set, trailer, and shelterduring detaching operations. Failure to follow this warning may cause serious injuryor death to personnel.Front axle steering locking pin must ALWAYS be Installed for side lift operation.Failure to follow this warning may cause front dolly to overturn, resulting in seriousinjury or death to personnel.Use extreme caution when using ladder. Have an assistant hold ladder to ensure thatIt is stable. Failure to follow this warning may cause serious Injury to personnel.Use caution to ensure that lift cylinder grease fittings DO NOT contact suspension linksand become damaged.a.At front and rear, perform the following steps:(1)Push up on two lift cylinder levers (12) to lower crossbrace assemblies (3) onto top of shelter (1).Dolly set is now suspended by crossbrace assemblies. Lifting chains (5) and axle chains (6) should be slack.2-103
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business