TM 9-2330-390-14&P2-13.ATTACHlNG FRONT AND REAR DOLLIES TO SHELTER (SHELTER ON TRAILER)(SIDE LIFT OPERATION) (Con’t).Use extreme caution when installing twist locks. Keep hands and/or feet clear of tophooks, top and bottom beams, and from between beams and shelter. Failure to followthis warning may cause serious injury to personnel.m.At front and rear, install two twist locks (22) through slots in top beam (1). Rotate twist locks 90° andinsert through crossbrace brackets (25). Rotate twist locks 90° again. Locate twist locks so that they are against top ofslots in top beam. Use twist lock wrench (Item 3, Appendix D) to fully tighten nuts (26). Ensure that twist lock pins (28)are vertical. Safety pins (27) do NOT need to be installed through twist locks.n.Loop and securetwo slings (32) to each axle (29) as illustrated. On front dolly, position slings betweentie-down D-rings (31) and steering stops (30). On rear dolly, position slings between tie-down D-rings and pintleassembly approximately 10 in. (25.4 cm) off centerline to each side.2-96
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business