TM 9-2330-390-14&P2-12.All-ACHING FRONT AND REAR DOLLIES TO SHELTER (SHELTER ON GROUND)(SIDE LIFT OPERATION) (Con’t).g.At front and rear top beams (2), remove twodetent pins (14) and rotate top hooks (15) 180° awayfrom shelter engagement position. Install detent pins.h. Remove two detent pins for crossbraceassemblies (16) from storage box on front dolly.Use extreme caution when climbing and working on top of shelter during side liftoperations. Ensure that top of shelter is free of ice or debris which could cause slipsand fails. When working with twist locks from on top of shelter, maintain athree-point contact with shelter as much as possible. When on top of shelter, alwaysbe aware of where other personnel and tools are located to prevent accidentalbumps and trips. Failure to follow this warning may cause serious injury topersonnel.All personnel standing on ground must stand clear when crossbrace assemblies arebeing removed from top beam. if a crossbrace assembly is dropped, serious injuryor death to personnel could result.i.At front and rear, remove detent pin (17) and crossbrace assembly (16) from stowage in top beam (2).Rest crossbrace assemblies on top of shelter (6).2-87
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business