TM 9-2330-390-14&P
2-11.
RAISING DOLLY SET WITH OR WITHOUT SHELTER AND COUPLING TO TOWING
VEHICLE (Cont).
r.
Deflate all air bags until top portion of each shock absorber reaches level of ride height indicator ring
(see paragraph 2-22).
NOTE
If raising a rear doily set in preparation for tandem towing, skip remaining steps in task.
s.
Using towing vehicle, pull dolly set, with or without shelter, slightly forward and check operation of
service brakes (see towing vehicle Operators Manual).
NOTE
If towing vehicle has a 12-volt system, blackout stoplight-taillights on rear dolly will
NOT be functioning.
If raising a front dolly set in preparation for tandem towing, lights on rear dolly will
NOT be functioning.
t. Check operation of lights (see towing vehicle Operators Manual).
2-12.
ATTACHlNG FRONT AND REAR DOLLIES TO SHELTER (SHELTER ON GROUND)
(SIDE LIFT OPERATION).
All personnel must use caution when standing near front and rear doilies and shelter
during attaching operations. Failure to follow this warning may cause serious injury
or death to personnel.
Front axle steering locking pin must ALWAYS be installed for side lift operation.
Failure to follow this warning may cause front dolly to overturn, resulting in serious
injury or death to personnel.
Use extreme caution when using ladder. Have an assistant hold ladder to ensure that
it is stable. Faliure to follow this warning may cause serious injury to personnel.
This operation CANNOT be performed unless Direct Support Maintenance has
installed side lift kit on dolly set.
NOTE
Component parts of side lift kit are stowed in storage box of front dolly.
a.
Place each dolly half in maneuvering position (see paragraph 2-21 b).
2-84
