TM 9-2330-275-14&P
4-52. TOOLBOX AND PLATFORM MAINTENANCE (M832 EXCEPT SN J089-001 THRU 159
AND J017-160 THRU 350) (Cont).
1.
Install wire rope assembly (17) to clevis (14) with screw (16).
2.
Install platform (10) and toolbox (7) to dolly sat with 15 new Iockwashers (24) and straws (25).
3.
Install pin (15) through clevis (14) and Iink (13) and install and of wire rope assembly (17) to pin.
4-135