TM 9-2330-275-14&P
4-52. TOOLBOX AND PLATFORM MAINTENANCE (M832 EXCEPT SN J089-001 THRU 159
AND J017-160 THRU 350).
This Task Covers
a.
Removal
c. Assembly
b. Disassembly
d. Installation
Initial Setup:
Materials/Parts:
Tools/Test Equipment:
One cotter pin
l General mechancs tool kit
One gasket
One spring pin
Fifteen lockwashers
a.
REMOVAL
1.
Remove wire rope assembly (17) from pin (15) and remove pin from clevis (14).
2.
Remove 15 screws (25) and lockwashers (24) and rwmovw toolbox (7) and platform (10) from dolly set. Discard
lockwashers.
3.
Remove screw (16) and wire rope assembly (17) from clevis (14).
1.
Remove nine nuts (23) and screws (26) and remove toolbox cover (1) from platform (10).
2.
Remove three nuts (5), screws (2), strike (4), and shim(3) from each side of toolbox cover (1).
3.
Remove gasket (6) from toolbox (7). Discard gasket.
4.
Remove cotter pin (18) from pin (19) and remove pin, two washers (20), and latch (11) from platform (10).
Discard cotter pin.
5.
Drive out spring pin (12) and remove link (13) from latch (11). Discard spring pin.
6.
Remove six nuts (9), screws (8), guide (21), and latch assembly (22) from two places on platform (10).
1.
Install latch assembly (22) and guide (21) with six screws (8) and nuts (9) to two places on platform (10).
2.
Position link (13) to latch (11) and press in new Spring pin (12).
3.
Install latch (11) to platform (10) with pin (19) and two washers (20). Install new cotter pin (16).
4.
Install new gasket (6) to toolbox (7).
5.
Inatall shim (3) and strike (4) to each side of toolbox cover (1) with three screws (2) and nuts (5).
6.
Inatall toolbox cover (1) to platform (10) with nine screws (26) and nuts (23).
4-134