TM 10-9925-100-12&P
OPERATOR MAINTENANCE
CONTAINERIZED CHAPEL
CC AND ASSOCIATED EQUIPMENT
INSPECT, SERVICE, REPLACE
INITIAL SETUP:
Tools
Personnel Required
As required by referenced publications
One
Materials/Parts
Equipment Condition
As required by referenced publications
CC set up but not in operation
INTRODUCTION
This work package contains operator maintenance procedures applicable to the CC as authorized by the
Maintenance Allocation Chart (MAC) in WP 0016 00 of this manual. The maintenance procedures in this
work package can be performed by one person, unless otherwise indicated. Read all WARNINGS,
CAUTIONS, and NOTES carefully before attempting the procedures, including the warnings at the front
of this manual.
NOTE
Operator maintenance for CC equipment must be performed in accordance with
applicable publications listed below. Personnel in MOS 51R, 52C. 52D, or 52G are
required for the performance of operator maintenance on the TQG (if used), ASH (if
used) and the Air Conditioner.
Perform operator maintenance on the TQG (if used) in accordance with TM 9-6115-671-14.
Perform operator maintenance on the ASH (if used) in accordance with TM 9-4520-258-14.
Perform operator maintenance on the Air Conditioner in accordance with TM 9-4120-398-14.
Perform operator maintenance on the TEMPER in accordance with TM 10-8340-224-13.
Perform operator maintenance on the 60 AMP power supply cable and pigtail in accordance with TM 9-
6150-226-13.
INSPECT
Inspect the CC Facility for cleanliness, and for missing or damaged equipment.
SERVICE
Clean the CC Facility as necessary as described in WP 0009 00.
REPLACE
Replace any damaged or otherwise faulty equipment using data in WP 0018 00 through WP0035 00.
END OF WORK PACKAGE