TM 10-9925-100-12&P
0009 00
LUBRICATION SERVICE INTERVALS
Ensure that lubrication requirements of the CC components are accomplished in accordance with the
CLEANING
Proper cleaning of the CC and components is an integral part of maintenance. It will help prevent possible
problems in the future. Regular cleaning, inside and out, of the CC is necessary. The CC interior should be
swept on a regular basis and the exterior kept policed. Refer to the literature furnished with commercial
equipment such as the television, microwave and other items for proper cleaning procedures.
Preventive Maintenance Checks and Services for CC
ITEM
INTERVAL
ITEM TO BE
PROCEDURE
EQUIPMENT NOT READY/
NO.
CHECKED OR
AVAILABLE IF:
SERVICED
TEMPER does not meet PMCS
1
As required TEMPER
Perform PMCS procedures on the
operational criteria specified in
TEMPER as specified in TM 10-8340-
TM 10-8340-224-13.
224-13.
Perform PMCS procedures on the TQG TQG and grounding does not meet
2
As required TQG (if used)
PMCS operational criteria specified
and grounding rod as specified in TM
in TM 9-6115-671-14.
9-6115-671-14.
ECU does not meet PMCS
3
As required Air Conditioner Perform PMCS procedures on the
operational criteria specified in
ECUs as specified in TM 9-4120-398-
TM 9-4120-398-14.
14.
4
As required ASH (if used)
Perform PMCS procedures on the ASH ASH does not meet PMCS
as specified in TM 9-4520-258-14.
operational criteria specified in TM
9-4520-258-14
General cargo container does not
5
As required General cargo
Perform PMCS procedures on the
general cargo container as specified in meet PMCS operational criteria
container
specified in TM 55-8115-204-23&P.
TM 55-8115-204-23&P.
60AMP power cable and pigtail
6
Before
60AMP power
Perform PMCS procedures on the 60
does not meet PMCS operational
After
cable
AMP power cable and pigtail as
criteria specified in TM 9-6150-226-
specified in TM 9-6150-226-13.
13.
Turn faulty or damaged equipment
Check folding chairs for damage. Test
7
Before
Chairs, audio,
into salvage and prepare requisition
audio and ancillary equipment such as
After
and ancillary
to replace it using data listed in WP
equipment
maker for proper operation.
END OF WORK PACKAGE
0009 00-2