TM 10-9925-100-12&P
0008 00
CONTAINERIZED CHAPEL
OPERATOR TROUBLESHOOTING PROCEDURES
PROCEDURE 1 COVERS
No power at convenience outlets
INITIAL SETUP:
Equipment Condition
CC set up but not in operation
Maintenance Level
Materials/Parts
Operator
None
IS POWER SOURCE CONNECTED TO
TEMPER POWER DISTRIBUTION BOX?
HAVE MOS 51R, 52C, 52D, OR 52G
QUALIFIED PERSONNEL CONNECT
NO
SOURCE TO THE TEMPER POWER
DISTRIBUTION BOX USING 60AMP, 100FT
POWER CABLES. CHECK AVAILABILITY
OF POWER AT CONVENIENCE OUTLETS.
IF POWER IS STILL NOT AVAILABLE,
YES
CONTINUE PROCEDURE.
ARE POWER DISTRIBUTION CABLES
PROPERLY CONNECTED TO THE TEMPER
POWER DISTRIBUTION BOX AND
CONVENIENCE OUTLETS? SEE TM 10-
8340-224-13.
REVIEW PROCEDURE IN TM 10-8340-224-
13 FOR CONNECTING POWER
DISTRIBUTION CABLES BETWEEN
NO
TEMPER POWER DISTRIBUTION BOX
AND THE CONVENIENCE OUTLETS. IF
YES
POWER IS STILL NOT AVAILABLE,
CONTINUE PROCEDURE.
ARE CIRCUIT BREAKERS ON TEMPER
POWER DISTRIBUTION BOX TRIPPED?
IF POWER IS STILL NOT AVAILABLE AT
NO
THE CONVENIENCE OUTLETS, NOTIFY
UNIT MAINTENANCE.
YES
RESET. IF POWER IS STILL NOT
AVAILABLE, CONTINUE PROCEDURE.
0008 00-2