TM 10-9925-100-12&P
0012 00
PROCEDURE 1 COVERS:
No power at Power Distribution Boxes
INITIAL SETUP:
Equipment Condition
CC set up but not in operation
Maintenance Level
Materials/Parts
Unit
None
IS POWER SOURCE SUPPLYING 208VAC
THREE PHASE POWER ?
HAVE MOS 51R, 52C, 52D, OR 52G
QUALIFIED PERSONNEL CHECK POWER
SOURCE FOR CORRECT POWER
OUTPUT. ENSURE TQG (if used) IS BEING
YES
OPERATED IN ACCORDANCE WITH
TM 9-6115-671-14. IF POWER IS STILL
NOT AVAILABLE, CONTINUE
NO
PROCEDURE.
IS POWER SOURCE (COMMERCIAL OR
TQG) CONNECTED TO TEMPER POWER
DISTRIBUTION BOX?
HAVE MOS 51R, 52C, 52D, OR 52G
QUALIFIED PERSONNEL CONNECT
NO
SOURCE TO THE TEMPER POWER
DISTRIBUTION BOX USING 60AMP, 100FT
POWER CABLES. CHECK AVAILABILITY
YES
OF POWER AT POWER DISTRIBUTION
BOX. IF POWER IS STILL NOT
ARE POWER DISTRIBUTION CABLES
AVAILABLE, CONTINUE PROCEDURE.
PROPERLY CONNECTED TO THE TEMPER
POWER DISTRIBUTION BOX?
REVIEW PROCEDURE IN TM 10-8340-224-
NO
13 FOR CONNECTING POWER
DISTRIBUTION CABLES BETWEEN
TEMPER POWER DISTRIBUTION BOX
AND THE CONVENIENCE OUTLETS. IF
POWER IS STILL NOT AVAILABLE,
YES
CONTINUE PROCEDURE.
ARE CIRCUIT BREAKERS ON POWER
DISTRIBUTION BOXES TRIPPED?
RESET CIRCUIT BREAKERS ON POWER
NO
DISTRIBUTION BOXES. REFER TO TM 10-
8340-224-13.
YES
ARE OPERATING CONTROLS ON TEMPER
POWER DISTRIBUTION BOXES PROPERLY
SET?
SET TOGGLE SWITCHES ON POWER
DISTRIBUTION BOXES TO ON. IF POWER
NO
IS STILL NOT AVAILABLE, CONTINUE
PROCEDURE.
YES
REFER TEMPER POWER DISTRIBUTION
BOX TO DIRECT SUPPORT MAINTENANCE
IN ACCORDANCE WITH TM 10-8340-224-13
0012 00-2