TM 10-9925-100-12&P
0012 00
PROCEDURE 3 COVERS
No heat or air conditioning
INITIAL SETUP:
Equipment Condition
CC set up but not in operation, power supplied
Maintenance Level
Materials/Parts
Unit
None
ARE ECUs OR ASH HEATER UNITS
OPERATING?
START AND OPERATE THE ECUs OR
NO
ASH UNITS AS DESCRIBED IN TM 9-4120-
398-14 OR TM 9-4520-258-14,
RESPECTIVELY.
YES
ARE OPERATING CONTROLS ON THE
ECUs AND ASH SET CORRECTLY?
REVIEW ECU AND ASH OPERATING
PROCEDURES AS DESCRIBED IN TM 9-
NO
4120-398-14 AND TM 9-4520-258-14,
RESPECTIVELY AND SET OPERATING
CONTROLS TO START THE FLOW OF
CONDITIONED AIR.
YES
REFER AN ASH OR ECU TO DIRECT
SUPPORT MAINTENANCE IN
ACCORDANCE WITH TM 9-4120-398-14
AND TM 9-4520-258-14, RESPECTIVELY.
END OF WORK PACKAGE
0012 00-4