Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
Figure 6. Install the Roof Cap Liner.
Roof Cap Installation
TM-10-8340-243-13-P Modular Command Post System (MCPS) Small Type I Green 5-4-6340-1 NSN: 8340-01-323-2454 Manual
Page Navigation
38
39
40
41
42
43
44
45
46
47
48
TM
10-8340-243-13&P
0005
6.
Attach
the
roof
cap
lining
(Figure
7,
Item
3) to
the
ridge
pole
(Figure 7,
Item
4)
using
the
five
straps
(Figure 7,
Item
8).
The
liner
will
hang
approximately
6
inches
from
the
ridge
poles.
7.
Insert
the
light
straps
(Figure
7,
Item
1)
through
the
slits
in
the
roof
cap
liner
(Figure 7,
Item
3).
8.
Secure
the
center
roof
pole
sleeves
(Figure
7,
Item
9)
with
hook
and
pile
fasteners.
9.
Attach
the
roof
cap
liner
to
the
roof
poles
with
the
hook
and
pile
fasteners
(Figure 7,
Item
10)
.
Make
sure
the
liner
is
positioned
between
the
ridge
pole
(Figure 7,
Item
4)
and
the
cables.
9
4
10
3
1
8
Figure 7.
Secure
the
Roof
Cap
Liner.
END
OF
TASK
0005-7
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business