TM 10-5411-203-132-6.PREPARATION FOR NOVEMENT (CONT)a.PackingProcedureforComplexinqKitPassaqewav-TypeI(ISOSheltertoISOShelter)(Cont)CAUTIONWhen packing Complexing Kit Passageway, ensure connector assemblyis not pinched by frame assemblies. Damage to connector assembly mayresult.NOTEThe following procedures require four persons.(4)Pack Complexing Kit Passageway as follows:(a)Pull frame assemblies (1) away from each other until connector assembly (2) is stretched tight;set assembly down.(b)Remove any foreign matter from connector assembly (2).(c)Fold one end of connector assembly (2) until frame assembly sets on opposite frame assembly.(d)Fold connector assembly toward frame assemblies.(e)Place folded Complexing Kit Passageway in shipping container with frame assemblies onbottom.2-51
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business