TM 10-5411-203-13
2-5. REMOVAL PROCEDURES (CONT)
b.
Removal of Complexing Kit Passageway - Type II., Class A and Class B (ISO Shelter to TEMPER) (Cont)
WARNING
When installing or removing frame assembly, avoid getting fingers caught
in hinged joints. Failure to do so may. result in severe injury.
NOTE
The next procedure requires two persons inside ISO shelter.
(10)
Remove frame assembly (1) from ISO shelter opening using the following steps:
(a)
Remove and store tent pins used to stake bottom corners of connector to ground.
(b)
Loosen strap assemblies located at each inside corner of connector assembly.
(c)
Unlatch locking pins (2) on sides (3) of frame assembly (1) and insert locking pins into retainer
tubes.
2-47