TM 10-5411-203-13
2-6.
PREPARATION FOR MOVEMENT (CONT)
b.
Packing Procedures for Complexing Kit Passageway - Type II (ISO Shelter to TEMPER) (Cont)
(1)
Remove ramp, passageway assembly, and exterior frame assembly. (Refer to para 2-5b.)
(2)
Place ramp (Type II, Class A) in shipping container and secure container cover.
(3)
Place disassembled stairway assembly (Type II, Class B) in shipping container and secure container
cover.
(4)
Pull connector with frame assembly ends away from each other until connector assembly is stretched
tight; set assembly down.
(5)
Remove any foreign matter from connector assembly.
(6)
Fold connector assembly end to end toward the frame assembly.
(7)
If diaper is to be used, wrap folded connector assembly in diaper and secure.
(8)
Place exterior frame assembly in the bottom of the shipping container.
(9)
Place the folded connector assembly in the shipping container and on top of the exterior frame.
(10)
Secure the shipping container.
2-52