TM 10-5411-200-14T.O. 35E4-177-1Section II.OPERATOR MAINTENANCE PROCEDURES3-3 GENERAL.Authorized maintenance procedures to be performed by operatorinclude replacement of area light assembly, replacement of light bulbs, hingedroof area ceiling lights, hinged panel leveling jack assemblies, endwallcloseout panel, sidewall closeout panels,ECU intake panel, ECU return panel,container lift jack assemblies, storm configuration components, supportbraces, and leveling jack extensions.3-4.AREA LIGHT ASSEMBLY REPLACEMENTThis task covers:a.Removalb.InstallationWARNINGDisconnect power of circuit involved by settingcircuit breaker to off position.REMOVAL1.Place circuit breaker CB8 to off position.2.Disconnect area light assembly connector (1) from power entry panel.3.Loosen two wingnuts (2) and lift area light assembly (3) from twobrackets (4) on shelter.4.Coil cable on brackets (5) on light post.3-4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business