TM 10-5411-200-14
T.O. 35E4-177-1
Section II.
OPERATOR MAINTENANCE PROCEDURES
3-3 GENERAL.
Authorized maintenance procedures to be performed by operator
include replacement of area light assembly, replacement of light bulbs, hinged
roof area ceiling lights, hinged panel leveling jack assemblies, endwall
closeout panel, sidewall closeout panels,
ECU intake panel, ECU return panel,
container lift jack assemblies, storm configuration components, support
braces, and leveling jack extensions.
3-4.
AREA LIGHT ASSEMBLY REPLACEMENT
This task covers:
a.
Removal
b.
Installation
WARNING
Disconnect power of circuit involved by setting
circuit breaker to off position.
REMOVAL
1.
Place circuit breaker CB8 to off position.
2.
Disconnect area light assembly connector (1) from power entry panel.
3.
Loosen two wingnuts (2) and lift area light assembly (3) from two
brackets (4) on shelter.
4.
Coil cable on brackets (5) on light post.
3-4