TM 10-5411-200-14T.O. 35E4-177-15-4.(cont)10.Apply solvent to sealed interface areas between roof, sidewall, andendwalls.11.Push roof up from endwalls to gain clearance for sling.Do notdamage roof panel.12.Slide web straps of lifting sling under roof and attach to crane orequivalent lifting device.13.Remove fixed roof.INSTALLATION1.Apply sealing compound to interface areas of fixed roof with fixedendwalls.2.Position fixed roof over shelter with crane (or equivalent liftingdevice) and a lifting sling with web straps.3.Support fixed roof and remove sling straps to allow roof to besupported by upper ISO fittings at corner posts.4.Align mounting holes at ISO fittings.5-9
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business