5-4. ROOF PANEL REPLACEMENT
This task covers
a.
b. Installation
INITIAL SETUP
Special Tools
Personnel - 6
Top lifting container lift sling, 1 Electrician
Appendix D
Standard Tools
Sealing compound, Item 19,
General mechanics tool kit
Appendix E
Solvent, Item 20, Appendix E
Materials
REMOVAL
1.
2.
3.
4.
5.
6.
7.
8.
9.
Disconnect site power.
Remove receptacle outlets. (Refer to paragraph 4-13)
Set main circuit breaker and circuit breaker CB6 to off position.
Remove hinged roof.
(Refer to paragraph 4-20)
Remove fixed roof area ceiling lights. (Refer to paragraph 4-12)
Disconnect and remove all wires from fixed roof beam. Tag all wires
for reconnection. (Refer to paragraph 4-16)
Remove bolts (1), lockwashers (2), and washers (3) securinq fixed roof
to upper ISO fittings (4).
.
Remove bolts (5), lockwashers (6), and washers (7) securing fixed roof
to fixed personnel endwall and sidewall.
Remove bolts (8), lockwashers (9), washers (10) and drip cap (11)
securing fixed roof to fixed cargo endwall.
W A R N I N G
Methylethylketone is flammable and toxic and shall
be used in swell-ventilated area away from sparks
or open flame.
Gloves should be worn during use.
5-8