TM 10-5410-284-13&PTM 10602A-13&PLIGHTWEIGHT MAINTENANCE ENCLOSURE (LME)0005 00OPERATION UNDER USUAL CONDITIONS0005 00-5Stand the next arch frame assembly upright and repeat the procedure until all bays are completed.Alternate the purlin brace direction (1) on the ridge purlins (2), changing sides from bay to bay. Pre-position all lower leg assemblies (3) and purlin assemblies (2) as shown but do not attach them.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business