TM 10-5410-284-13&PTM 10602A-13&PLIGHTWEIGHT MAINTENANCE ENCLOSURE (LME)0005 00OPERATION UNDER USUAL CONDITIONS0005 00-8Gather personnel and, on command, lift the fabric assembly and carry it into position over the ridge (1),stepping carefully through the frame (2), place the ridge grommets (3) over the ridge posts (4).Securewith hitch clip pins (5) attached to fabric assembly.Unroll the fabric uniformly toward the eaves until the eave grommets align with the eave posts. Pull thefabric away from the eaves to avoid pinching the fabric.Secure with hitch clip pins attached to fabricassembly.Place one End Fabric Panel near the end of the structure.Remove the hitch clip pins (1) on the end arch assemblies. Lift the Intermediate Fabric Panel centergrommet (2) off the ridge post (3). Place the End Fabric Panel center grommet (4) over the ridge post(3). Replace the Intermediate Fabric Panel center grommet (2) over the ridge post . Secure with the hitchclip pin (1). Repeat the procedure at both eaves. Begin lacing the End Fabric Panel to the IntermediateFabric Panel, starting at the ridge and proceeding toward the eaves, closing the weatherseal flap (5) asthe lacing progresses. Repeat the procedure at the other end of the structure (6).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business