REMOVAL AND INSTALLATION OF MAJOR COMPONENTS AND ASSEMBLIES
b. Disconnect and remove tie down cables from
section of shelter where component is being removed.
This section contains the removal and installation
c. Disconnect and if necessary remove all electrical
procedures for the shelter body and electrical system
cables and components that may interfere with the
of the expandable shelter, as allocated by direct and
general support maintenance.
for removal procedures.
4-10. Preliminary Procedure.
Removal of power cable from receptacle J1
The expandable shelter contains voltages
on power entrance panel must be ac-
that are dangerous if contacted. Before
complished by a qualified electrician.
removing or installing electrical cables or
components, make certain electrical power
a. Removal To remove the swingout walls from
is completely disconnected from the circuit
the expandable shelter, perform the following
involved. Four men are required to perform
procedure:
the removal and installation procedures for
(1) Perform preliminary procedure of paragraph
the shelter body.
(2) Unpin roof support struts from stowed posi-
NOTE
tion on one side of expandable shelter. Place struts in
Do not remove any panel for the purpose of
repair unless absolutely necessary. Most
position to support foldout roof panel on section
panel repair can be accomplished while
panels are installed.
(3) Inside shelter, release two latches (4, figure
4-2) securing each swingout wall to
the foldout roof
panel. Also, release six latches (16, figure 4-3) secur-
a. Turn all circuit breakers on circuit breaker panel
ing foldout end wall to foldout roof panel.
to off position.
NOTE
Do not attempt to remove any panel or
major part of the center structure. These
procedures only apply to the foldout
sections.