TM 9-2330-390-14&P4-80. FRONT DOLLY PIVOTING TRAY REPLACEMENT (Con't).3.Install two brackets (2) on pivoting tray (1) withfour flatwashers (12), shoulder screws (13), flat-washers (11), and new locknuts (10).4.5.Apply sealing compound to jamnuts (5). Fully in-stall jamnuts on bearing rods (6) until bottomedout. Install bearing rods on brackets (2) with flat-washers (4) and new locknuts (3). Torquelocknuts to 85 lb.-ft. (115 N•m).Install pivoting tray (1) on two suspension linkmounting brackets (7) with two bearing rods (6),flatwashers (8), and new locknuts (9). Torquelocknuts to 25-30 lb.-ft. (34-41 N•m).Follow-onTasks:• Install engine (see paragraph 4-115).• install hydraulic reservoir and redundant power fittings (see paragraph 4-111).• Install hydraulic lines (see paragraph 4-109).• Install battery case assembly (see paragraph 4-44).• Install front dolly relay emergency valve and air reservoir (see paragraph 4-62).• Install front doily pressure protection valve (see paragraph 4-64).• Install front dolly booster relay valve (see paragraph 4-63).• Install airbrake valve (see paragraph 4-65).• Install pivoting tray gladhands (see paragraph 4-71).• Install front dolly air lines (see paragraph 4-72).• Lubricate pivoting tray bearings (see Lubrication Instructions, Chapter 3, Sectlon I).4-214
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business