TM 9-2330-390-14&P
4-80. FRONT DOLLY PIVOTING TRAY REPLACEMENT (Con't).
3.
Install two brackets (2) on pivoting tray (1) with
four flatwashers (12), shoulder screws (13), flat-
washers (11), and new locknuts (10).
4.
5.
Apply sealing compound to jamnuts (5). Fully in-
stall jamnuts on bearing rods (6) until bottomed
out. Install bearing rods on brackets (2) with flat-
washers (4) and new locknuts (3). Torque
locknuts to 85 lb.-ft. (115 Nm).
Install pivoting tray (1) on two suspension link
mounting brackets (7) with two bearing rods (6),
flatwashers (8), and new locknuts (9). Torque
locknuts to 25-30 lb.-ft. (34-41 Nm).
Follow-on Tasks:
Install engine (see paragraph 4-115).
install hydraulic reservoir and redundant power fittings (see paragraph 4-111).
Install hydraulic lines (see paragraph 4-109).
Install battery case assembly (see paragraph 4-44).
Install front dolly relay emergency valve and air reservoir (see paragraph 4-62).
Install front doily pressure protection valve (see paragraph 4-64).
Install front dolly booster relay valve (see paragraph 4-63).
Install airbrake valve (see paragraph 4-65).
Install pivoting tray gladhands (see paragraph 4-71).
Install front dolly air lines (see paragraph 4-72).
Lubricate pivoting tray bearings (see Lubrication Instructions, Chapter 3, Sectlon I).
4-214