Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
SIGNAL CONDITIONING BOX-TO-FORWARD JUNCTION BOX CABLE ASSEMBLY REPLACEMENT - cont
SIGNAL CONDITIONING BOX-TO-FORWARD JUNCTION BOX CABLE ASSEMBLY REPLACEMENT - cont - TM-9-2330-390-14P_352
TM-9-2330-390-14P Semitrailer Tank: 5 000 Gallon (Portable Water Dispensining) XM1098 (NSN 2300-01-330-2779) Manual
Page Navigation
310
311
312
313
314
315
316
317
318
319
320
TM 9-2330-390-14&P
4-46. SIGNAL CONDITIONING BOX-TO-FORWARD JUNCTION BOX CABLE ASSEMBLY
REPLACEMENT (Con’t).
7.
8.
9.
Remove nut (16) and green ground wire (3) from
screw (18).
Remove seven nuts (19)
lockwashers
(20) and
cable assembly wires (2) from terminals of circuit
breakers (17).
Loosen two screws (21) and open cover (15) of
signal conditioning box (22).
10.
Remove locknut (23) from cord connector (25).
11.
Remove cord connector (25), sealing ring (24), and cable assembly (14) from signal conditioning box (22).
12.
Loosen nut (26) and remove cable assembly (14) from cord connector (25).
4-86
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business