TM 9-2330-390-14&P
4-46. SIGNAL CONDITIONING BOX-TO-FORWARD JUNCTION BOX CABLE ASSEMBLY
REPLACEMENT (Cont).
7.
8.
9.
Remove nut (16) and green ground wire (3) from
screw (18).
Remove seven nuts (19) lockwashers (20) and
cable assembly wires (2) from terminals of circuit
breakers (17).
Loosen two screws (21) and open cover (15) of
signal conditioning box (22).
10.
Remove locknut (23) from cord connector (25).
11.
Remove cord connector (25), sealing ring (24), and cable assembly (14) from signal conditioning box (22).
12.
Loosen nut (26) and remove cable assembly (14) from cord connector (25).
4-86