TM 9-2330-275-14&P
4-53. TOOLBOX AND PLATFORM MAINTENANCE (M832 SN J089-001 THRU 159 AND
J017-160 THRU 350 ONLY) (Cont).
11.
Install six screws (18) and nuts (21), two catch strikes (20), and four
shims (19) on cover assembly (9).
12.
Install hinge (8) on cover assembly (9) with nine new rivets (7).
13.
Install nine screws (6) and new self-locking nuts (12) and cover assembly (9) on platform assembly (11).
14.
Install hinge (10) on platform essembly (11) with 15 new rivets (15).
d.
INSTALLATION
1.
Install screw (4) and wire rope assembly (5) on clevis (1).
2.
Position platform assembly (11) on dolly set and install 15
screws (14) and new Iockwashers (13) through hinge (10).
3.
lnstall connector link (2) in clevis (1) and secure with quick-
release pin (3). Install wire rope assembly (5) on quick-
release pin (3).
4-141