Table 2-1. Installation Check List
Step
Procedure
Reference
1
Select deployment site
Paragraph 2-4
2
Prepare site
Paragraph 2-5
3
Position Shelters, ACG, Power System
Paragraph 2-6
4
Install Shelters
Shelter Manuals listed in
table 1-1
5
Install ACG
ACG Manual T.O. 35E9-170-1
6
Install Distribution Box J-3336
Distribution Box Manual
7
Erect TEREC Antenna
TEREC Downlink Equipment
Manual T.O.10H9-22-1
8
Segment cabling
Paragraph 2-9
9
Data Link and Intercom setup
Paragraph 2-10
10
Operational Checkout
Paragraph 2-14
Table 2-2. Site Area Requirements
Site
II Segment Nomenclature
Length (ft)
Width (ft)
AN/TYQ-11(V)4 and AN/TYQ-11(V)8 (2 Shelters)
186
43
AN/TYQ-11 (V)6 and AN/TYQ-11(V)9 (3 Shelters)
186
85
AN/TYQ-11(V)10 (3 Shelters)
225
110
AN/TYQ-12(V)4 (1 Shelter)
186
43
Figure 2-1. Interpretation Segment Plot Plan, Typical
Change 1 2-2