TM 10-7310-281-13&P
MODERN BURNER UNIT (MBU)
PREVENTIVE MAINTENANCE CHECK AND SERVICES (PMCS)
0010 00
0010 00-5
THIS SECTION COVERS:
Before Operation PMCS Checks and Services
INITIAL SETUP:
Battery Pack not in operation
Maintenance Level
Operator
Table 1. Preventive Maintenance Checks and Services for MBU - continued.
ITEM
NO.
INTERVAL
MAN-
HOUR
ITEM TO BE
CHECKED
OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
3
Before
Battery Pack
WARNING!
Two Person Lift
The Battery Pack weighs approximately 80 pounds
(36.3 kg). Two persons must carry the Battery Pack,
lifting with legs, not back, to prevent injury.
Inspect battery pack cover (1) control panel (2) and
power connectors (3) for damage. Check condition and
charge status of batteries (4).
Control panel or
power connectors
damaged. Battery
charge less than
40%.
Battery Pack Before Operation PMCS
1
2
3
4