TM 10-7310-281-13&P
MODERN BURNER UNIT (MBU)
PREVENTIVE MAINTENANCE CHECK AND SERVICES (PMCS)
0010 00
0010 00-8
THIS SECTION COVERS:
During Operation PMCS Checks and Services
INITIAL SETUP:
MBU system in operation
Maintenance Level
Operator
Table 4-1. Preventive Maintenance Checks and Services for MBU - continued.
ITEM
NO.
INTERVAL
MAN-
HOUR
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
5
During
MBU and
Battery Pack
WARNING! Electric Shock
Lethal voltage is present when the MBU is connected
to a power source. Limit procedures to a visual
inspection as indicated. Serious injury or death by
electrocution may occur if component under power is
touched.
WARNING!
Two Person Lift
The Battery Pack and MBU require two persons to lift.
Each should be lifted with legs, not back, to prevent
injury.
Monitor the control panel (1) of the MBU for any fault
indicators lit up. Respond as described in WP 0009.
Check battery charge (2) frequently. Recharge as
necessary. Check Charging Status indicators (3) for
Over temp or Low Charging Voltage fault indicator.
MBU out of fuel.
Battery charge
less than 40%.
Battery Over Temp
indicator lit.
Low Charging
Voltage indicator
lit.
MBU and Battery Pack During Operation PMCS
1
2
3
