TM 10-7310-281-13&P
MODERN BURNER UNIT (MBU)
PREVENTIVE MAINTENANCE CHECK AND SERVICES (PMCS)
0010 00
0010 00-4
THIS SECTION COVERS:
Before Operation PMCS Checks and Services
INITIAL SETUP:
Power Converter turned OFF
Maintenance Level
Operator
Table 1. Preventive Maintenance Checks and Services for MBU - continued.
ITEM
NO.
INTERVAL
MAN-
HOUR
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
2
Before
Power
Converter
Visually inspect the converter (1) for external damage,
missing or frayed power cord (2) damaged control
panel (3) or connectors (4).
Converter
damaged, cooling
fins bent, power
cord missing or
frayed, control
panel or power
connectors
damaged.
Power Converter Before Operation PMCS
1
2
3
4