TM 10-5411-203-134-13. EXTERIOR FRAME PIN AND LANYARD ASSEMBLY MAINTENANCE INSTRUCTIONS (TYPE II ONLY)This task covers:ReplaceINITIALSETUP:ToolsDrill, electric, portable (Appendix B, Section III, Item 3)Drill set, twist (Appendix B, Section III, Item 4)Stake, sheetmetal working (Appendix B, SectionIII, Item 8)Tool kit, general mechanic's (Appendix B, Section III, Item 1)Parts/MaterialsPin and lanyard assemblyRivet, solid (Appendix D, Item 8)REMOVEWARNINGWear safety glasses while drilling out rivets. Failure to do so could result inserious eye injury.1.Drill out rivet (1) connecting tab (2) to bar (3).2.Remove any remaining portion of pin and lanyard assembly (4).INSTALL1.Hold the tab (2) in place and install rivet (1) to secure to bar (3).2.Check the holding strength of the replaced assembly (4).4-12
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business