TM 10-5411-203-13
4 - 16. FRAME HINGE MAINTENANCE INSTRUCTIONS
This task covers:
a. Replace
b. Manufacture
INITIAL SETUP:
Tools
Drill, electric, portable (Appendix B, Section III, Item 3)
Drill set, twist (Appendix B, Section III, Item 3)
Riveter set (Appendix B, Section III, Item 5)
Tape, measuring (Appendix B, Section III, Item 7)
Tool kit, general mechanic's (Appendix B, Section III, Item 1)
Parts/Materials
Hinge, frame
Rivet, blind (Appendix D, Item 9)
Hinge (bulk) (Appendix D, Item 10)
Equipment Condition
Complexing Kit Passageway removed from shelter. (Refer to para 2-5.)
REMOVE
4-17