Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
FRAME ASSEMBLY MAINTENANCE INSTRUCTIONS (CONT)
INSTALL - TM-10-5411-203-13_81
TM-10-5411-203-13 Complexing Kit Passage-ways Complexing Kit Passageways Type II Class A Class B Type I Manual
Page Navigation
70
71
72
73
74
75
76
77
78
79
80
TM 10-5411-203-13
4 - 15. FRAME LOCKING PIN ASSEMBLY MAINTENANCE INSTRUCTIONS
This task covers:
Replace
INITIAL
SETUP:
Tools
Drill, electric, portable (Appendix B, Section III, Item 3)
Drill set, twist (Appendix B, Section III, Item 3)
Riveter set (Appendix B, Section III, Item 5)
Tool kit, general mechanic's (Appendix B, Section III, Item 1)
Parts/Materials
Locking pin assembly
Rivet, blind (Appendix D, Item 9)
Equipment
Condition
Complexing Kit Passageway removed trom shelter. (Refer to para 2-5.)
REMOVE
4-15
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business