TM 10-5411-203-13
2-4. INSTALLATION AND PREPARATION FOR USE (CONT)
a. Installing Complexing Kit Passageway - Type I (ISO Shelter to ISO Shelter) (Cont)
(12)
Adjust doors using the following steps:
(a) By moving pedestal assemblies (1) and pivot assemblies (2) on each door, adjust gap (3) between doors and
gap (4) between doors and sides of the passageway frame. Gaps should be approximately 1/8 in. After an
even gap is obtained, tighten mounting screws on pedestal assemblies (1) and pivot assemblies (2).
(b) Adjust gap at top of door and top of passageway frame by turning height adjusting screw (5) clockwise to
raise door.
(c) Test doors by swinging one, then the other thru full range of motion. If any interference is encountered,
additional adjustment may be necessary.
2-19