TM 10-5411-203-13
2-4.
INSTALLATION AND PREPARATION FOR USE (CONT)
a.
Installing Complexing Kit Passageway - Type I (ISO Shelter to ISO Shelter) (Cont)
(f)
Lower hinged roof support struts to floor until hinged roof panel (3) is supported on struts.
WARNING
When installing or removing weather barrier between hinged roof panel and hinged
sidewall or endwall of ISO shelter, take care to avoid fingers getting caught. Failure to
do so may result in serious injury.
(g) Insert weather barrier (1) through open space between hinged roof panel (3) and ISO shelter (2).
(h) Using handles (7), pull weather barrier (1) inside ISO shelter (2) until edge of weather barrier covers top
of frame.
(i)
Using two hinged roof support struts, lower hinged roof panel (3) onto weather barrier (1) and ISO shelter
(2).
(j)
Repeat steps (a) through (i) for other weather barrier (1).
2-15