TM 10-5411-203-13
2-4.
INSTALLATION AND PREPARATION FOR USE (CONT)
a.
Installing Complexing Kit Passageway - Type I (ISO Shelter to ISO Shelter) (Cont)
NOTE
This next procedure requires two persons on the inside and two persons on the outside
of the ISO shelter.
(9) Secure weather barriers (1) to ISO shelter (2) using the following steps:
(a) Unlatch all roof panel latches to release hinged roof panel (3) from ISO shelter (2).
(b) Pull locking pins (4) to allow roof support struts (5) to swing down from hinged roof panel (3).
(c) Extend inner tube (6) of roof support struts (5).
(d) Insert locking pins (4) through holes in roof support struts (5) and inner tubes (6) when holes align.
(e) Using the two roof support struts (5), push up hinged roof panel (3) until roof support struts are in full
upright position.
2-14