TM 10-5410-229-13&PTable 4-1.UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)WeeklyM- MonthlyQ - QuarterlyITEMINTERVALITEM TO BENO.WMQINSPECTEDPROCEDUREMCPS FabricCheck fabric assemblies, including walls, liners,Assemblies(continued)floor, roof cap, gutter, and transport bags for rips, tears,missingstraps, broken or missing grommets, quick disconnect fasteners and/ or separated seams. Repair if necessary.Inspect condition of hook and pile fasteners. Check for ripsor separating seams. Repair if necessary. (See para 4-12.)WARNINGWhen handling tent frame, do not grasp the frame near the frame joints. Failure to do so canresult in personnel injury to hands and fingers.4*Frame Check frameAssemblyassembly components for damage, suchas bends or missing handles. Check detentassemblies on legs and fittings for cracksand proper operation. Check fittings andconnector on purlins for proper operation.Repair if necessary. (See Para 4-13.)5*AnchoringInsure all tent pins areComponents present and in serviceablecondition. Check tent lines for cuts andsigns of mildew, excessive wear, orfraying. Check for presence and conditionof tent line slips. Replace components ifnecessary.Change 2 4-7
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business